Project Profile: The project is located in Xiaodianzi Village, Zhangjiawo Town. The heating station covers an area of ​​7,8843.3 square meters. The total construction scale is 7T 70MW coal-fired hot water boilers. The designed heating area is 7.75 million square meters and it is constructed in two phases. This project is a phase I project with a construction scale of 4T 70MW hot water boilers, with a designed heating area of ​​approximately 4.5 million square meters, and supporting the construction of corresponding coal storage, coal transportation, and other facilities, using direct hot water supply to the township Internal heating. Construction Unit: Tianjin Ruicheng Heating Co., Ltd. Postal address: East of Xiaodianzi Village, Zhangjiawo Town, Xiqing District, Tianjin Postcode: 300380 Design Unit: Tianjin Tianfayuan Environmental Protection Agency Center Co., Ltd. (EIA) Light Mounts,Offset Ring Mount,Tactical Light Ring Mount,Round Disk Light Guangzhou Miaozhun Jie Trade Co.,Ltd. , http://www.focuhunter.shop
Progress Stage: Environmental Impact Assessment Construction Period: 2011-2012
The total investment of the project is 095 million.
Contact: Wang Gong Telephone Fax
Postal address: No. 4 Weiyuan Road, Huayuan Industrial Park, Tianjin Postcode: 300384
Contact: Zhu Gong Fax
Zhangjiawo Town Heating Station Project Phase I Project
Project Title: Phase 1 Project of Zhangjiawo Town Heating Station Project (2011-2012, 095 million)
Related Developments: Tower Crane Infrastructure Project