Project Description: Construction unit: Nanjing Tiexin Real Estate Development Co., Ltd. Postal address: No. 47, Paifang Lane, Nanjing 210029 Design Unit: Jiangsu Shengtai Environmental Technology Co., Ltd. (EIA) Hospital Medical airtight Sliding Door The medical automatic door is a door that is generally installed in the operating room or the ICU ward for the medical staff to push in and out of the hospital bed. The medical automatic door has the function of inductive opening and safety anti-pinch. The medical staff only needs to extend the foot into the light control foot sensing box next to the entrance, and the door will automatically close.
After a period of time, the door will automatically close after the cart and medical staff have fully entered. If someone or a cart is next to the door leaf, the door will not close to provide a safe anti-pinch. In addition, the door frame of the medical automatic door is made of sealed profile, which has the characteristics of high air tightness; the light control foot sensing is adopted for the entrance and exit, so that the medical staff can open the door [without contact", which can effectively isolate the bacteria and personnel.
If you are interested in our products, please kindly contact us hospital door,medical sliding door,automatic medical airtight doors,hospital automatic sliding airtight door,hermetic airtight shielding door SHENZHEN HONGFA AUTOMATIC DOOR CO., LTD , http://www.hongfahss.com
Project Name: Expansion of Dadingfang Phase II of Economically Efficient Housing Project Progress Stage: Environmental Impact Assessment Construction Period: 2011-2012 Major Equipment: Fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation facilities, lighting facilities, cranes .
The project is located on the west side of Ningdan Road, Yuhuatai Tiexinqiao Street of Nanjing City, on the north side of Guantong Road and on the south side of Shuike Road, and on the north and west side of Dadingfang Affordable Housing Phase I Project, with a total land area of ​​265,002.28 square meters, and the construction land area. 91812.9 square meters, other land acquisition area is 173189.42 square meters, the total construction area of ​​construction land is 233338.38 square meters, on-ground construction area is 201388.38 square meters, underground construction area is 31950 square meters, including residential construction area is 175103.11 square meters, commercial construction area is 20513.48 square meters. The kindergarten has a building area of ​​5771.79 square meters, a floor area ratio of 2.19, a building density of 20.35%, a greening ratio of 37.33%, a total number of 2350 households, and 880 parking spaces for motor vehicles. The total investment of the project is 520 million yuan.
Contact: Wu Min Telephone
Postal address: Huayan Building, 58-1 Yu Dao Street, Nanjing Zip code: 210007
Contact: Zeng Shi Telephone 8007
Fax to 8003
Affordable housing second phase project
The second phase of affordable housing project (2011-2012, 520 million yuan)
Related Developments: Tower Crane Infrastructure Project