(1) Install hot blast stoves, dust collectors, fans, and other ancillary equipment. Check the fan to see if the blade's steering is correct, but also check the air flow control valve and the feed adjustment board to see if it is adjustable. (2) After everything is inspected, the hot stove is ignited and the smoke igniter is started. Later, the fan and the motor are turned on to keep the equipment in operation. (3) After the temperature of the air temperature reaches the required level, the material shall be placed. Pay attention to the appropriate speed and adapt it to the output. When the equipment is running, the temperature of the drying air outlet of the drying main unit should be controlled between 80°C and 120°C. If the temperature is too high or too low, adjust the feeding amount, and observe whether the main motor rotates or not. Too much, at this time, the machine should be shut down in time. (4) The general test time is 1 hour for the convenience of calculating the output. After the end of the test, measure the moisture content of the material. If it does not meet the requirements, adjust the dryer, increase the amount of hot air or adjust the speed of the feeder to increase the inlet air temperature. (5) After the feeding experiment is completed, cooling should be performed first. After the temperature of the air temperature of the stove drops to the specified value, the host and the power supply are turned off. Composite Air Filter,Hepa Composite Filter,Air Purifier Composite Filter,Composite Activated Carbon Filter Guangdong Zhengshang Electrical Technology Co., Ltd. , https://www.zengsung.com
What are the details of the flash dryer test run?